Stormwater compliance

Stormwater code simplified

From Rainwise paperwork to local permit nuances, here’s how to stay compliant across Seattle and the Eastside.

Stormwater compliance ensures runoff is managed safely and that Rainwise rebates stay valid. Osprey Exterior partners with municipal reviewers to document every detail, from downspout routing to infiltration trench dimensions. Start with our services overview to understand how drainage, gutters, and cisterns align.

Documented gutter installation for compliance
Inspector-ready gutter corner with labeled fasteners.
Technician replacing hardware during audit
Hardware replacement recorded in the maintenance log.
Permeable landscape meeting code
Permeable hardscape sized per Eastside stormwater code.

Seattle requirements

Seattle Public Utilities requires proof that new systems disconnect from the combined sewer and infiltrate on-site. RainWise projects must include before-and-after diagrams, calculations, and photos. We host all files in a secure client portal for rapid sharing with inspectors.

Interactive compliance checklist

Toggle the items below to track your readiness before requesting an inspection.

Share this checklist with your project manager so everyone tracks progress in real time.

Eastside city highlights

In Bellevue, code section 24.06 outlines detention and infiltration standards. Redmond and Kirkland focus on pre-application meetings and erosion control. Our compliance team keeps templates updated for each jurisdiction.

Documentation you’ll need

  • Site assessment: Photos of downspouts, grading, and pervious surfaces.
  • Design packet: Drawings that show pipe sizing, cistern layout, and overflow routing.
  • Post-install checklist: Signed inspection forms, rebate paperwork, and maintenance schedule.

Pair these documents with our project portfolio to see how code compliance leads to fast approvals.

Staying compliant long term

Annual gutter cleaning, cistern inspections, and reviewing seasonal maintenance checklists keep systems operating. Osprey Exterior offers service plans and cistern tune-ups to maintain warranty and rebate status.

Authority

Stormwater compliance experts

Certification icon
Cross-jurisdiction certified

Approved contractor for Seattle, Bellevue, Redmond, Kirkland, and Issaquah stormwater programs.

Documentation icon
Digital compliance vault

All permits, drawings, and inspection notes are stored securely for instant sharing.

Team badge
Dedicated compliance liaisons

Our liaisons coordinate with city reviewers daily to expedite approvals.

FAQs

Compliance questions

Inspectors provide a correction list. We prioritize fixes and reschedule quickly—most Rainwise projects pass after the first follow-up.

Seattle approvals average two weeks, while Bellevue and Redmond can take up to three. Our documentation accelerates review times.

Yes. Rainwise payouts are contingent on passing inspection. We submit signed forms and photos within 24 hours of completion.

Get compliant

Need a stormwater compliance audit?

We’ll review your system, prepare documentation, and coordinate inspector walk-throughs.

Book a compliance visit